You will see the the stages of the construction of this project below which was made in 2014 by Şule Alkan with the support of French landscape architect Eddie Pineau.It was 600 squaremeters felt system green wall application which was blended with thermowood and stone pavement as well.All the irrigation and drainage requirements were carefully planned and solved in the project stage in detailed and implemented completely as project during the stage of the construction.
You will also see below the last pictures which was taken december,2015 to show sustainability and why planning stage is important to create long-lasting green wall systems.